New Sarawak Museum

Sarawak

Sarawak

This project presents the New Sarawak Museum with exhibition spaces, commercial lots, function rooms and auditorium spaces. Consisting of 2 new buildings, the Borneo Cultures Museum and Annexe Office Building were officially completed in January 2020.

In Pantau Projek, transparency is assessed based on 39 data points covering basic Project Identification as well as the phases of Preparation, Procurement, Implementation, and Completion. Data is only considered publicly available if it can be obtained online from a credible source.

Available on State Govt and Project Owner website

Available on 3rd party website

Not available on any website

Project Identification

Project owner
Jabatan Muzium Sarawak
Sector, subsector
Tourism, Arts & Culture
Project name
Borneo Cultural Museum
Project location
Jalan Tun Abang Haji Openg, 93400, Kuching, Sarawak
Purpose
The new facilities will ensure that the Sarawak heritage, in the form of a wide array of collections, is safely and securely stored, preserved, documented, researched and well exhibited, according to the latest standards by the International Council of Museums.
Project description
The new five-storey Sarawak Museum building consists of exhibition gallery spaces on Levels 2 to 5, flanking a central atrium on both wings. Level 1 houses commercial lots, a café, function rooms and auditorium spaces, which support and complement the temporary exhibition gallery.
Project scope (main output)
Gross Floor Area: Approximately 31,000 square metres
Building Height
Main: 5 storeys; 42.9 metres
Annex: 3 storeys; 19.7 metres
Environmental impact
The information was not available online at the time of assessment.
Land and settlement impact
The information was not available online at the time of assessment.
Contact details
Sarawak Museum Department
Jalan P Ramlee
93400, Kuching, Sarawak
Tel Hq: +6082-548181
Fax: +082-548282
Email: museum@sarawak.gov.my
Funding sources
Sarawak State Government
Project budget
RM308million + RM28million for conservation of existing museum building
Project budget approval date
Cahya Mata Sarawak Berhad website: budget approved on 14th April 2015
Procuring entity
Cahya Mata Sarawak Bhd (CMSB)
Procuring entity contact details
Cahya Mata Sarawak,
Level 6, Wisma Mahmud,
Jalan Sungai Sarawak,
93100 Kuching, Sarawak, Malaysia
+60 82 238 888
+60 82 333 828
www@cmsb.my
Procurement process
Direct Award – PPES Works (Sarawak) Sdn Bhd signed a Design & Build and negotiated contract with the Sarawak State Government for the proposed Sarawak Museum Campus & Heritage Trail in Kuching.
Contract type
Design and Build and Negotiated Contract with the Sarawak State Government
Contract status (current)
Closed (Project complete)
Number of firms tendering
The information was not available online at the time of assessment.
Cost estimate
RM 308 million
Contract administration entity
PPES Works (Sarawak) Sdn Bhd, a subsidiary of CMS Works Sdn Bhd
Contract title
The information was not available online at the time of assessment.
Contract firm(s)
PPES Works (Sarawak) Sdn Bhd, a subsidiary of CMS Works Sdn Bhd
Contract price
RM 308 million
Contract scope of work
The contract between the Sarawak State Government/ Jabatan Muzium Sarawak and CMB Sdn Bhd
Contract start date
The information was not available online at the time of assessment.
Contract duration
5 years (2015-2020)
Variation to contract price
No official statement or reports on contract price variation.
Escalation of contract price
The information was not available online at the time of assessment.
Variation to contract duration
“The new Sarawak Museum Complex, handed over to the Public Works Department (JKR) Sarawak and Museum Department Sarawak” according to Borneo Post dated 9/8/2019.
Variation to contract scope
The information was not available online at the time of assessment.
Reasons for price changes
The information was not available online at the time of assessment.
Reasons for scope & duration changes
The information was not available online at the time of assessment.
Project status (current)
Completed: handed over to JKR & Sarawak Museum on 8/8/2019
Completion cost (projected)
RM 323 million
Completion date (projected)
January 2020
Scope at completion
The information was not available online at the time of assessment.
Reasons for project changes
The information was not available online at the time of assessment.
Reference to audit and evaluation reports
The information was not available online at the time of assessment.

More
Projects

Download The Pantau Belanjawan Dataset

Download The Pantau Laksana Dataset