Terengganu Drawbridge
(Jambatan Angkat Terengganu)

Terengganu

Terengganu

This project is South East Asia’s first tower drawbridge. It was officially launched and open for use in 2019.

In Pantau Projek, transparency is assessed based on 39 data points covering basic Project Identification as well as the phases of Preparation, Procurement, Implementation, and Completion. Data is only considered publicly available if it can be obtained online from a credible source.

Available on State Govt and Project Owner website

Available on 3rd party website

Not available on any website

Project Identification

Project owner
Terengganu State Government
Sector, subsector
Tourism Transport/ Urban Development – Traffic
Project name
Terengganu Drawbridge/ Jambatan Angkat Terengganu
Project location
Mouth of Kuala Terengganu RIver, Terengganu, Malaysia. [postcode: 20000]
Purpose
  • Reduce traffic congestion: provides a road link between the development of the North and South Estuaries and Kuala Terengganu
  • Boost the tourism industry
  • create a commercial centre through promoting ease of flow for the shipbuilding industry by allowing steady traffic
Project description
  • A gateway that acts as a road link to the new Kuala Terengganu City Centre (KTCC)
  • A landmark structure with a central bascule span bordered by 4 towers and 2 skybridge (includes an Observation Platform, a Sky Café / Restaurant & Gallery)
Project scope (main output)
  • Overall length of the bridge is 632m, with a width of 23m
  • Clear span of the drawbridge is 50m long
Environmental impact
EIA carried out but unavailable online
Land and settlement impact
Details not available online (EIA & other assessments carried out but not available online)
Contact details
Tingkat 15 Wisma Darul Iman Kuala Terengganu, Terengganu, 20503 Malaysia
webmaster@terengganu.gov.my
Funding sources
Funded by Terengganu State Government
Project budget
RM248 million
Project budget approval date
The information is unavailable online at the time of assessment.
Procuring entity
Wilayah Ekonomi Pantai Timur (ECER)
Procuring entity contact details
ZELAN BERHAD (27676-V)
24th Floor, Wisma Zelan
No. 1, Jalan Tasik Permaisuri 2,
Bandar Tun Razak, Cheras, 56000 Kuala Lumpur, Malaysia
Tel: +603 9173 9173
Fax: +603 9171 8191
Email: info@zelan.com.my
GPS Coordinate: ( 3.09963,101.717933 )
Procurement process
Open Tender
Contract type
The information is unavailable online at the time of assessment.
Contract status (current)
Closed
Number of firms tendering
The information is unavailable online at the time of assessment.
Cost estimate
The information is unavailable online at the time of assessment.
Contract administration entity
Wilayah Ekonomi Pantai Timur (ECER).
Contract title
The proposed Construction and Completion of the Drawbridge Connecting Muara North and Muara South in Kuala Terengganu City Centre for the East Coast Economic Region Development Council (ECERDC) (IN/T14-020)
Contract firm(s)
Zelan – Hasrat Sedaya Consortium
Contract price
The contract value is RM 248,728,66 and won by Zelan-Hasrat Usaha Consoritum
Contract scope of work
The information is unavailable online at the time of assessment.
Contract start date
13 August 2014
Contract duration
The contract duration is 135 weeks, commencing on the date for possession of the Site on 13 August 2014. However, due to improvisations, the works are still in progress and a new completion date will be determined soon.
Variation to contract price
The information is unavailable online at the time of assessment.
Escalation of contract price
The information is unavailable online at the time of assessment.
Variation to contract duration
The information is unavailable online at the time of assessment.
Variation to contract scope
The information is unavailable online at the time of assessment.
Reasons for price changes
The information is unavailable online at the time of assessment.
Reasons for scope & duration changes
The information is unavailable online at the time of assessment.
Project status (current)
Completed
Completion cost (projected)
RM248 million
Completion date (projected)
3/14/2017
Scope at completion
Bridge is:
  • 638 meter in length
  • 76-meter bascule can be raised and lowered
Reasons for project changes
In 2019, the bridge was still incomplete – at “99% completion”. No information available as to what caused the delay.
Reference to audit and evaluation reports
The information is unavailable online at the time of assessment.